Monday, June 27, 2016

Building the stairs and railing and installing the light fixture


 The cork floors are now exposed and the stairs are built. They are working on staining them, which is proving challenging. We'll get there though with another coat or two.






The light fixture and ductless air system in the mud room are installed now too!


Inside, there's still paint touch-up work to do and staining a patch of wood flooring, but that's about it. Next up is the back yard, which still looks like this...