Over the past week and a half, the foundation was finished, the floor joists were installed, along with the subfloor, and the framing for the outer walls started to go in. Here's a few shots of the work through today.
This will be the new walk-in shower:
This is the shower from the other angle. The boarded up window is our current bathroom's former window.
This is the view standing in the new nook looking down into the mud room. The opening will be the new back door.
This is what it all looks like from the yard. There will be four arched windows to the left of the door, eventually.
This is all exciting progress. A roof should be on before too long too!
Thursday, April 7, 2016
Monday, March 28, 2016
Progress on the foundation
Here's the progress in the last week. After they dug out all the dirt, they assembled the concrete forms and poured the foundation footings. This happened while we were in NYC.
They then built another set of forms on top of the footings and poured more concrete for the foundation walls.
And here's how it's looked since about last Tuesday evening.
The foundation still needs some pea gravel for the upper part (left side of picture) and a slab for the lower part (right side). Then, some back fill dirt and the foundation is done! Hopefully all that can happen this week!
Thursday, March 17, 2016
What a mess!
I'm hoping this is the messiest stage of this project...
The foundation was dug today, after two weeks of no work, and I would have better pictures, except that they are still out there, I leave town tomorrow, my laptop has to get mailed back to Mass. to get re-imaged, and I wanted to share pictures tonight.
First the fence came down...
Then the heavy equipment moved in...
And they dug and dug and dug...
This is about 25% of the hole...
And our Japanese spurge and patio pavers got crushed in the process. Though Travis promised to fix them, my heart breaks a little thinking about all the work we went to laying them ourselves.
The foundation was dug today, after two weeks of no work, and I would have better pictures, except that they are still out there, I leave town tomorrow, my laptop has to get mailed back to Mass. to get re-imaged, and I wanted to share pictures tonight.
First the fence came down...
Then the heavy equipment moved in...
And they dug and dug and dug...
This is about 25% of the hole...
And our Japanese spurge and patio pavers got crushed in the process. Though Travis promised to fix them, my heart breaks a little thinking about all the work we went to laying them ourselves.
Tuesday, March 1, 2016
Two Weeks In...
...demo is almost done, and hopefully the foundation work can start soon.
Day 0:
Day 3:
And then it snowed:
Day 8:
Demo included salvaging half of the original brick to use on the addition to blend it with new brick. This is only part of the salvaged brick.
We're hoping for some dry weather so we can pick up the pace!
Day 0:
Day 3:
And then it snowed:
Day 8:
Demo included salvaging half of the original brick to use on the addition to blend it with new brick. This is only part of the salvaged brick.
We're hoping for some dry weather so we can pick up the pace!
Our 2016 Addition...
...comes in the form of additional square footage!
After months of planning, all the details and paperwork, including a variance with the county, are in place for us to start our addition.
Here's the current floor plan:
Here's the same view with the addition off the kitchen:
And the new view with more detail:
From the outside, here's the side views:
After months of planning, all the details and paperwork, including a variance with the county, are in place for us to start our addition.
Here's the current floor plan:
Here's the same view with the addition off the kitchen:
And the new view with more detail:
From the outside, here's the side views:
It's a little tough to tell from the side views where the addition
is if you're not familiar with the house, but the walls with arched windows
will be new.
Wednesday, February 4, 2015
Fireplace
We almost seem to be outgrowing our house, or at least the first floor, with all the baby toys, books, a Pack'n'Play, Exersaucer, Moses basket, Mamaroo, etc., etc. filling every corner and walkway. Our basement is finished so we knew it would be a great additional space for evening lounging once we got it set up, except for the steady 55-degree temperature down there. Alas, a gas fireplace seemed like the best solution for the space to warm it up!
Like most things around here, we had to wait a while for the installation, but it's finally done! Here's a few shots that I took along the way.
We still have some work to do for furniture and decor, but it's nice and cozy down there now!
Like most things around here, we had to wait a while for the installation, but it's finally done! Here's a few shots that I took along the way.
We still have some work to do for furniture and decor, but it's nice and cozy down there now!
Tuesday, December 23, 2014
Exterior Painting - finished up!
After weeks and weeks of the painters working on our house, they've finally finished enough for me to get some pictures of the house looking like a finished product!
We've come a long way since this spring. Here's one more before and after:
We've come a long way since this spring. Here's one more before and after:
Subscribe to: